From approved drawings to fabrication, LED assembly, inspection and packing.
Production steps vary by product and approved project specification.
01-04 Drawing & Cutting | 05-08 Forming & Finishing | 09-12 Painting & Lighting | 13-16 Inspection & Packing
Drawing & Cutting

01
Drawing Approval
Confirm dimensions, materials and details before production.

02
Production Files
Prepare cutting files and part details for manufacturing.

03
Laser Cutting
Cut specified metal and acrylic components to the approved files.

04
CNC Routing
Machine letter shapes and details to the approved design.
Forming & Finishing

05
Bending
Form returns and curves to the required letter shape.

06
Welding
Join components and check alignment before finishing.

07
Surface Preparation
Smooth joints and prepare the specified surface finish.

08
Vinyl Application
Apply the approved graphics where specified.
Painting & Lighting

09
Painting
Apply the approved color and finish specification.

10
Drying & Curing
Dry and cure the coating before assembly.

11
LED Assembly
Fit LED modules and wiring for the approved lighting layout.

12
Lighting Tests
Check illumination and electrical function before packing.
Inspection & Packing

13
Installation Template
Prepare the full-size layout template for site positioning.

14
Final Inspection
Inspect workmanship, cleanliness and project requirements.

15
Accessory Verification
Check layout, fixings, power supplies and specified accessories.

16
Protective Packing
Choose protective packaging for the product and transport method.
Before Your Signs Leave the Factory
See how inspection and packing support your project.
Ready to Discuss Your Sign Project?
Share your artwork, dimensions, quantity and destination.